LBNL Masthead A-Z IndexBerkeley Lab mastheadU.S. Department of Energy logoPhone BookJobsSearch
Upcoming Long-Term Operating Schedule Print

Note: The two main drivers for the extended shutdown during this period are the replacement of the storage-ring rf crowbar system with a high-voltage switch (overcurrent protection) and a full survey and alignment of the storage ring. In addition, the superbend cold heads will be replaced, new beam-position-monitor buttons will be installed, and various beamline requests will be addressed.

This schedule is also available as an .xls spreadsheet and on Google Calendar.